This purpose of this project is to upgrade the existing water piping that supplies the Fall Creek Adult Fish Collection Facility. The system consists of three steel conduits, each conduit with three multilevel intakes known as fish horns (nine total fish horns). Work features include: rehabilitation of existing fish horns; replacement of couplings, flanges, pipes and hydraulic actuated knife valves; design and installation of hydraulic power unit; new electrical and controls; and replacement of pipe and steel structures at fish discharge facility. All work will be complete in January 2016.

OWNER
USACE Portland District
LOCATION
Fall Creek, OR
YEAR
2015
JOB NUMBER
15-203