Berth 1 Bitt Repair, Phase 1 and 2
These two contracts required the demolition and replacement of ship mooring bitts. Other work included foundation strengthening, pile reinforcement and bull rail repair.
Location:
Vancouver, Washington
Owner:
Port of Vancouver