This is a $4.7 million project that includes removing and installing new low voltage and medium voltage motor control centers and large unwatering and drainage pumps, and installation of an oil water separator system all inside the powerhouse at Lower Monumental Dam. On site work began October 2018 and is schedule to be completed by summer of 2019.
Owner:
USACE, Walla Walla District
Location:
Kahlotus, Washington