This $6.6 million project is just about to start. The work consists of replacing the drainage and unwatering pump systems with associated piping and motor control centers in the drainage gallery of all the power generating units. It also includes adding an oil water separator system. This project is scheduled to be completed early 2020
Location
Dayton, Washington
Owner
US Army Corps of Engineers, Walla Walla District