This $4.1 million project is currently underway. The work consists of the addition of catwalks and guardrails. It also includes upgrading the existing walkways, electrical systems, and lighting. The work is located in the attic of Powerhouse 1. This project is scheduled to be completed in the fall of 2019.
Location
North Bonneville, Washington
Owner
US Army Corps of Engineers, Portland District